It is still unknown when the Malik swimming pool will be able to reopen.
Since the six-hour power outage that hit Nuuk, the swimming pool has been closed as a so-called PLC control unit for water and chemical dosing broke down due to the lack of power.
- The new water installation is expected to be delivered in the coming days, and after installation, the operation will be thoroughly tested before it can be reopened, it is announced in a Facebook post from the swimming pool.
It is also reported that repeated problems with the ventilation systems are keeping the sauna, health cabin and steam room closed.
It is reported that work is being carried out at full speed to resolve the problems, which, among other things, have required spare parts to be shipped from abroad to Nuuk.
- We will let you know as soon as there is news, writes the Malik swimming pool.